The toilet and shower facilities serving the boarding pupils within this listed building were reorganised and replaced to give a crisp, fresh environment. The available areas have been combined into one wet room using continuous floor and wall materials to facilitate easy cleaning and coloured glass shower cubicles were used to maximise the available natural light in the room, providing an airy, brighter finish. Under floor heating, highly efficient LED lighting along with humidity controlled ventilation and timed flows on the basin and shower taps were installed to maximise the energy efficiency for the school.

Project Type

Refurbishment of shower & toilet facilities

Location

Shackleford